info@yatrinepal.com

(+977) 9841792727

Road Construction at Muktinath

Muktinath Temple
Muktinath Temple

Beni to Ghasa road is now under construction. From 7:30 to 11:00 in the morning and from 2:30 till 6:30 it will be closed for traveler. Every vehicle on the way during the closing time requires to stop. After the construction, road to Jomsom will be black-topped and visitor get more attracted.