• 16 years of Experience
  • Gov. Regd. no.: 163713/073/074
  • Tourism Licence. no.: 2293/073

Jyatha, Thamel
Kathmandu-29, Nepal

info@yatrinepal.com
(+977) 1 4226237

(+977) 9851159806

Road Construction at Muktinath

Muktinath Temple
Muktinath Temple

Beni to Ghasa road is now under construction. From 7:30 to 11:00 in the morning and from 2:30 till 6:30 it will be closed for traveler. Every vehicle on the way during the closing time requires to stop. After the construction, road to Jomsom will be black-topped and visitor get more attracted.